"description":"To perform an initial RF test with a longer pulse."
},
"StabilityTest":{
"id":50,
"description":"To be used mostly for beam stability test."
},
"SlowCommissioning":{
"id":60,
"description":"Very short pulse planned to be used used during Normal Conducting Linac commissioning. It would allow installation of the rest of the Linac in parallel to Beam Commissioning."