- Mar 10, 2020
-
-
Benjamin Bolling authored
The Synoptic now looks quiet pretty and valves controls have been added (both VVMC and VVS) for the ISrc-LEBT section.
-
- Mar 09, 2020
-
-
Benjamin Bolling authored
Added valves to the accelerator synoptics for ISRC-RFQ and embedded displays for VVS and VVMC valves.
-
Benjamin Bolling authored
-
Benjamin Bolling authored
Fixed the accelerator synoptics: Now all widgets have the correct aspect ratio and each one has the height 100 px.
-
- Mar 06, 2020
-
-
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
Master See merge request ics-software/ess-opis!141
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
- Mar 05, 2020
-
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
- Mar 04, 2020
-
-
- Mar 02, 2020
-
-
Benjamin Bertrand authored
Fixed LockID faceplates issue See merge request ics-software/ess-opis!140
-
Emilio Asensi authored
-
Benjamin Bertrand authored
TS2 modifications, heaters with power feedback and new flow switch device See merge request ics-software/ess-opis!139
-
Emilio Asensi authored
-
- Feb 28, 2020
-
-
Benjamin Bertrand authored
Vacuum legend updates See merge request ics-software/ess-opis!138
-
Krisztián Löki authored
-
-
Krisztián Löki authored
-
-
- Feb 27, 2020
-
-
Benjamin Bolling authored
-
- Feb 26, 2020
-
-
Benjamin Bertrand authored
Updates to TICP OPIs See merge request ics-software/ess-opis!137
-
Per Nilsson2 authored
-
-
Benjamin Bolling authored
All display controllers are now connected via macros and not direct PV names, making it easy to edit, add or remove PV:s as these are defined in the beginning of each .bob-file.
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
New Functionalities to the Operators Overview OPI See merge request ics-software/ess-opis!136
-
Benjamin Bolling authored
Added plots for the BLM:s in the PBI tab. Each section and some combo sections have their own BLM plot with each BLM's radiation level shown as intensity in the plot.
-
- Feb 25, 2020
-
-
Benjamin Bolling authored
Beam position trajectory widget added for all sections and some combined sections in the PBI tab under Beam Position. Also some updates to the beam modes checker to assist operators in checking beam permit for different modes.
-
-
- Feb 24, 2020
-
-
Thomas Fay authored
-
Thomas Fay authored
-
Benjamin Bolling authored
BPM widgets setup for multiple sections and combined sections of the Linac. Blue line for the vertical BPM zero position has also been added.
-
- Feb 21, 2020
-
-
Benjamin Bertrand authored
Master See merge request ics-software/ess-opis!135
-
Benjamin Bolling authored
-
Benjamin Bolling authored
worked on the beam settings window: there is now a set of rules implemented which check which modes are accepted / 'OK' and which are not, and why not. The condition failing for the different modes has a red background.
-
- Feb 20, 2020
-
-
Benjamin Bertrand authored
Updates for the collected overview OPI:s See merge request ics-software/ess-opis!134
-
Benjamin Bolling authored
-