- Feb 19, 2020
-
-
Emilio Asensi authored
-
Benjamin Bertrand authored
target update from Johannes See merge request ics-software/ess-opis!130
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
Updates to the collected Operators' OPI screens See merge request ics-software/ess-opis!129
-
Benjamin Bolling authored
-
- Feb 18, 2020
-
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
Split a combined actions button into 4 separate buttons for more clarity on that it (now they) are actually (a) button(s).
-
Benjamin Bolling authored
-
- Feb 17, 2020
-
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
Added the 3-shift functionality to TS2 SLOPI and operations SLOPI widgets: 00-08 = C, 08-16 = A, 16-24 = B
-
Benjamin Bolling authored
-
- Feb 14, 2020
-
-
Benjamin Bertrand authored
Fix for ODH TS2 area, vacuum screen improvements and fixes See merge request ics-software/ess-opis!126
-
Krisztián Löki authored
-
Krisztián Löki authored
-
Benjamin Bertrand authored
Updates on OPERATOR-OVERVIEW-OPIS See merge request ics-software/ess-opis!125
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
Split up cavs/MBL into cavs/MBL[1,2] and cavs/HBL into cavs/HBL[1,2,3]. Resized all windows except PBI which is to be done later today so that all fits perfectly into current LCR screens.
-
- Feb 13, 2020
-
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
Trends and phoebus/eclipse compatible screens See merge request ics-software/ess-opis!124
-
Emilio Asensi authored
-
- Feb 12, 2020
-
-
Benjamin Bolling authored
Minor adjustments and added a new tab under system interlocks which is temporarily named 'PSS' and only contains an embedded window pointed to the main ODH overview screen.
-
Benjamin Bolling authored
fixed the horizontal center-line for the BPM widget in PBI. began making the beam transmission window in PBI, supports selection of and showing the beam charge from 2 BCM:s but not yet the transmission. It either has to be calculated in the OPI or in a soft-IOC with the latter being the preferred method.
-
- Feb 11, 2020
-
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
corrected two mistakes with labelling. See merge request ics-software/ess-opis!123
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
updated the SL OPI message boxes and now also have a dedicated one for TS2. See merge request ics-software/ess-opis!122
-
Benjamin Bolling authored
-
Benjamin Bertrand authored
Request to add the collected OPI screens to the ess-opis master branch See merge request ics-software/ess-opis!121
-
Benjamin Bolling authored
fixed background for subtabs to distinguish from subwindows. Renamed Beam Loss to Beam Loss Monitor (sounds less bad). Fixed path for the cryogenics overview.
-
- Feb 10, 2020
-
-
Benjamin Bertrand authored
Development See merge request ics-software/ess-opis!120
-
Rafael Montano authored
-
Benjamin Bolling authored
Revert "Replaced the 'Gauge' widgets by 'meter' widgets." See merge request benjaminbolling/ess-opis!1
-